01
Tell us about the project
Start with the property, rooms, timing and the result you want. We will identify the main decisions and give you practical initial advice.
- New detached home
- Renovation or extension
- Residential development
Residential flooring installation
A clear process for new homes, renovations and residential developments across Melbourne's east.
Discuss your projectAdvice, selection, preparation, installation and protection considered as one sequence.

The exact scope changes with the property and construction program. These are the decisions we resolve from enquiry through to handover.
01
Start with the property, rooms, timing and the result you want. We will identify the main decisions and give you practical initial advice.
02
Visit our Burwood East showroom to compare flooring in person. Provide architectural plans for review, or arrange a site measure when confirmed dimensions are needed.
03
For detached new homes, we inspect the substrate before installation and determine whether levelling work is required. The scope is confirmed from actual site conditions.
04
Timber flooring is installed using a full-spread adhesive system. We use a 6 mm notched trowel and ENF-rated flooring adhesive, subject to the selected product and substrate specification.
05
Floor protection can be added when other trades still need access. On some volume-builder homes, flooring is installed near the end of the build and separate protection may not be necessary.
Detached new homes
We inspect the floor before installation. Where the substrate is outside the required tolerance, self-levelling is included in the recommended preparation scope.
The scope may include skirting removal and installation, or installation only. Painting follows installation, then caulking completes the junctions. Responsibilities are confirmed before scheduling.

We apply flooring adhesive across the prepared substrate using a 6 mm notched trowel. The ENF-rated adhesive and application method are checked against the selected flooring system.
A full-spread system supports consistent contact between the flooring and substrate. Site conditions and product requirements remain the final guide for preparation and installation.
Plans are helpful for understanding room sizes, floor direction, transitions and project sequencing. If plans are unavailable or dimensions need confirmation, a site measure can be arranged.
No. The substrate is inspected first. Levelling requirements depend on the actual floor condition and the tolerance required by the selected flooring system.
The agreed scope may include skirting removal and reinstallation, or installation only. Painting and caulking follow the skirting installation, with trade responsibilities confirmed before work begins.
Not always. Protection is recommended when other trades will continue working through the area. It may be unnecessary when flooring is installed at the final stage of a well-sequenced build.
We will help identify the flooring, preparation and installation decisions that need to be made next.
Discuss your project